Buying & Project Planning10 min readBy KITOEMPublished

Switching Teamwear Suppliers: A Handover Checklist for Design, Fit and Samples

To switch teamwear suppliers, first identify the product references you can share, define what must stay consistent, and ask the replacement manufacturer to review the gaps before quoting. Then approve the relevant materials, fit and decoration on identified samples before releasing bulk production. A photograph, an old jersey and a size label are useful starting points, but they do not establish a complete manufacturing specification.

A buyer’s guide from KITOEM

This guide is for football clubs, schools, teamwear brands and distributors transferring an existing product or qualifying an alternative supplier.

Define the reason for switching—and the outcome you need

Start with a short account of what the next supplier must do differently. Describe observable issues: a sample differed from the measurement sheet, a badge used the wrong artwork, or a promised milestone passed without an updated plan. Separate those records from opinions about the previous supplier.

Next, distinguish continuity from redevelopment. Are you trying to preserve an accepted jersey, correct a known problem, or launch an updated range? These are different briefs. If the old fit was unsuccessful, asking a new factory to reproduce it faithfully will carry the problem forward.

Identify who approves technical details, who consolidates player feedback and who authorises the commercial order.

Build one controlled handover register

Collect the latest usable references in one folder and list them in a handover register. Mark superseded versions clearly. Give physical garments and swatches an identifier that also appears in the register.

Use the table below as a working template. Add your file names, revision dates, availability, sharing permissions and responsible person. These are suggested fields, not a record of a completed KITOEM order.

Handover itemWhat to provideWhat the new supplier should confirmEvidence before release
Product identityStyle reference and separate shirt, shorts and layer descriptionsWhich products the quotation coversProduct list linked to the quotation
ArtworkAuthorised crest, sponsor, number and name files with revisionsFile usability, dimensions and placement on each garmentApproved artwork and decoration reference
Fit and measurementsMeasurement sheet, measurement method and accepted fit referenceMissing points, proposed tolerances and fit questionsRecorded sample measurements and fit comments
Patterns and gradingAvailable files, size coverage and permission to shareFile compatibility and any development work requiredAccepted pattern or measurement revisions
Material and trimsIdentified swatches, specifications and available trim referencesAvailability, proposed substitutions and review needsApproved material and trim references
ColourAgreed physical reference and available colour specificationsHow each material and decoration will be assessedRecorded colour approval
PersonalisationControlled names, numbers, product sizes and versionHow records connect to each garmentApproved roster and garment layout
Labels and packingLabel artwork, product information and packing allocationRequired files and product-specific arrangementsApproved label and packing instructions
Inspection and deliveryAgreed checks, documents, destination and required arrivalInspection scope and delivery responsibilitiesInspection plan and delivery agreement

Do not hide missing information inside a general instruction such as “same as before”. Mark it as an open question and ask the supplier to explain the consequence for development, price or timing.

Confirm permission before transferring files

For patterns, editable artwork and technical files, record who can authorise their use and sharing. Ask for written clarification where permission is unclear. Keep unresolved files out of the transfer until the appropriate parties have clarified their use.

For confidential material, agree access controls and appropriate confidentiality arrangements before sharing it. WIPO identifies restricted access, confidential marking and agreements with business partners as protective measures. Those measures do not determine ownership of a particular pattern or artwork. WIPO: How to Protect Trade Secrets?

If ownership or contractual rights are disputed, obtain advice specific to the agreement and jurisdiction before proceeding.

Separate design continuity from fit and material approval

Create three lists: keep, change and investigate. A club might want to keep its visual identity, change sleeve comfort and investigate whether the old material can still be sourced. Avoid combining all three into “copy our current kit”.

For fit, identify the garment measurements and measurement method, then record wearer feedback separately. Do not transfer size letters alone. For a shirt-and-shorts set, review the two products independently rather than assuming every wearer needs the same labelled size in both.

For materials, provide the best available specification and an identified reference. Ask the supplier to name proposed alternatives and the differences that require approval. Do not approve a substitution solely because the supplier calls it equivalent.

For colour and decoration, establish what will be compared and on which surface. An approved digital layout should not be treated as approval of a physical print, badge or finished garment.

Close view of a plain grey jersey hem, black fabric and a measuring tape on a light table

Evaluate the replacement supplier against your actual transfer

Send prospective suppliers the same brief and request a written response to the same questions. Ask which requirements they can review, what information is missing, what work is included and what remains subject to sampling.

A useful response identifies a specific gap and proposes a way to resolve it. A broad promise to match everything is less useful than a response explaining which material, construction or measurement needs further review.

Keep company checks separate from product approval. Confirm the contracting party, proposed payment recipient, production arrangements and responsibilities through the appropriate documents. A convincing sample does not answer every company or payment question; a company profile does not approve your garment.

Agree the sample plan before placing the transfer order

Ask what each sample will establish. Depending on the project, material, fit and decoration questions may be reviewed separately or combined. Record the sample identity, file revisions, intended review and any unapproved substitute materials.

Use four clear outcomes: accepted, accepted only for the stated scope, revision required, or not reviewed. If a sample confirms fit but uses a temporary fabric, do not describe the whole product as approved.

Ask how size coverage will be checked, particularly where different fits or size groups are involved. One accepted garment does not document every size. Agree whether an initial limited production run is useful and available; do not assume the supplier offers a particular trial quantity.

For a fuller approval record, use the sportswear sample approval guide.

Compare transfer costs and build a calendar around approvals

Request separate lines for any pattern work, material development, sampling, decoration setup, bulk garments, packing and transport that apply. Ask which charges are one-time, which recur and which depend on unresolved specifications. Confirm any sample-credit arrangement in writing rather than assuming it.

Set the calendar from the date the goods need to be usable. Include time for missing-file review, material decisions, sample feedback, revisions, production, inspection and transport. Identify who owns each approval and what starts the next stage.

If you are maintaining existing supply during the transfer, record which supplier covers which order. Confirm outstanding commitments and available inventory before relying on either route. Do not treat production completion, dispatch and destination arrival as the same milestone.

Use one sportswear RFQ format for comparable supplier responses.

Release bulk production against one approved version

Before authorising bulk production, reconcile the quotation, product specification, sample record, artwork, roster and packing instructions. Each should point to the same accepted product version. Record any authorised differences explicitly.

Define inspection points, acceptance criteria, records and the process for reviewing a discrepancy. Sample approval and bulk inspection are separate decisions: an accepted sample does not establish that every garment in a later shipment meets the order.

Preserve the final reference set for repeat orders. Include the procedure for material substitutions, artwork changes and future availability checks. The teamwear reorder guide explains what to agree before the first order with a new supplier.

Planning a transfer to KITOEM?

Send the product list, available specifications, reference photographs, sample information, intended quantities, destination and required arrival date through the KITOEM contact page. Explain what must stay consistent and what you want to change. Request a review of the available references, development scope and quotation assumptions before agreeing the next step.

FREQUENTLY ASKED QUESTIONS

Questions buyers ask next

Can I switch teamwear suppliers without the original patterns?

Start by asking the new supplier to assess the references you are authorised to share. These might include measurement sheets, approved artwork and physical garments. Ask what additional development and sampling would be needed, and what cannot be established from those references. Do not assume that an existing garment provides a complete pattern or that the new supplier can reproduce it exactly. Feasibility and permitted use need to be clarified before committing to production.

Will the new supplier’s medium fit like our existing medium?

Do not approve the transfer by size name alone. Provide the current garment measurements, the measurement method and an accepted wearer-fit reference where available. Ask the new supplier to document the proposed measurements and size coverage, then review the agreed samples. If preserving fit is essential, identify the specific points that matter, such as body length, chest width or openings, and agree their evaluation rather than relying on an M label.

Can the new factory use exactly the same fabric and colour?

Ask it to check the identified material and colour references before making a commitment. If the original material is unavailable or insufficiently documented, request a clearly identified alternative and a comparison plan. Decide which differences are acceptable and which require another sample or assessment. Keep material and colour approvals linked to the product version. A description such as “same polyester” or a screen image is not sufficient to record an exact match.

How many samples should we approve before moving a bulk order?

Base the plan on the questions still unresolved. Material selection, fit, size coverage and decoration may require different evidence, even where some checks share a sample. Ask the supplier to propose a review plan and explain what each reference confirms. Record exclusions and open points. There is no sample count specified by this guide, and approval of one size or one decoration should not be recorded as approval of everything else.

How long does it take to change teamwear manufacturers?

Request a project-specific schedule after the supplier reviews the available files, material requirements and development gaps. Include buyer approval time, potential revisions, production, inspection and transport. Ask which milestones are conditional and what happens if an approval is delayed. This guide does not provide a fixed transfer lead time. A required match-day date should be assessed against the complete plan before the buyer relies on it.

Should we transfer the whole range at once?

Discuss the transfer by product and risk. One established shirt may have complete references, while a jacket or a different fit needs further development. Ask whether a staged transfer is practical under the suppliers’ commercial terms and your existing commitments. Where two suppliers overlap, keep quantities, approvals and version records distinct. A staged route is a planning option, not a guarantee of smaller minimums or uninterrupted availability.

What if the replacement sample differs from our handover pack?

Identify the difference against a named reference, photograph or measure it as appropriate, and record the affected product and sample version. Ask whether it is an error, a proposed substitution or a point that was never specified. Keep accepted features recorded while reopening the disputed points. Request the agreed correction or further evidence, and do not release the affected bulk specification while its approval remains unresolved.

Prepared by KITOEM for B2B teamwear buyers. Product feasibility, development scope, quantities, pricing, sample arrangements and delivery terms must be confirmed for the specific project.